Due to security reasons we are not able to share interior images.


US Airways, Inc.

SMC has been providing space planning, design and move management services for US Airways, Inc. since 1999 for the Pittsburgh Airport Operations.


Pittsburgh, PA


70,456 RSF (60,456 Build-Out with 10,000 Expansion)
Commercial Aviation - New Construction; Flight Operations Control Center
Consolidation – SOC; Tempe, AZ (America West) and OCC; Moon Township, PA (US Airways)
Occupancy - 275 Seats (Expand to 365 seats with 600 total positions (including shifts))
Duration - 18 Month

  • Base Building Sizing and Design
  • Programming
  • Test Fit Block Planning
  • Design Development/Documents
  • Schematic Design
  • Design Development/Documents
  • Interior Architecture Finish Selections
  • Construction Document Review & Edit
  • Furniture Planning, Specification, & Inventory for Reuse
  • Relocation/Move Management
  • Asset Disposition
  • Decommission Existing Building

Contact Us

379 Insurance St.
Beaver, PA 15009